RUSH EXCERPT:ZELDIN: "Great news, oh the first thing. As soon as the D.C. mayor had contacted, the present in the White House asked for help presence on an emergency declaration right away. He made EPA. The lead agency worked army corps national park service, other federal partners. By mid-March, we completed the Potomac interceptor fix. Then at that we moved to remediation. The goal was to get remediation done before America to fifty events, great news as we sit here this afternoon today. As of this afternoon, we are done with the federal response, and that was a multi-step process which we were. It was everything from the dub sampling on the soil in the water to removing contaminated comedy contaminated soil, all that dry, all that sewage impact and soil. We covered the contaminated soil with seed mix. We did erosion, control, blankets, on top of it, we’re clearing out, fallen, trees and brush and debris. We flushed out the canal using rush. What or from the Potomac and but all that’s left right now is a small area that D.C. water is going to have completed by the end of may, at the end of this month, up to relax 10 and eleven of the sea canal doing soil remediation, so well ahead of schedule for America 250 events. This is what we call Trump speed"

FindClipsBankNewsBaseRadioBankPodBankTranscriptBankPhotoBankPrintBankClipLiveClipperNewsClipperTVClipperWebClipperRadioClipperPodClipperGifCreatorNewsMonitorCityMonitorShareUploadGifsGalleryLiveShareShowCasterAboutNewsHow-ToRSSLoginRegisterNewsListsClips

EPA Lee Zeldin on Wastewater Cleanup of the Potomac: We Covered the Contaminated Soil, We Flushed Out The C&O Canal Using Fresh Water‘Well ahead of schedule for America 250 event, this is what we call Trump speed’News & PoliticsRUSH EXCERPT:ZELDIN: "Great news, oh the first thing. As soon as the D.C. mayor had contacted, the present in the White House asked for help presence on an emergency declaration right away. He made EPA. The lead agency worked army corps national park service, other federal partners. By mid-March, we completed the Potomac interceptor fix. Then at that we moved to remediation. The goal was to get remediation done before America to fifty events, great news as we sit here this afternoon today. As of this afternoon, we are done with the federal response, and that was a multi-step process which we were. It was everything from the dub sampling on the soil in the water to removing contaminated comedy contaminated soil, all that dry, all that sewage impact and soil. We covered the contaminated soil with seed mix. We did erosion, control, blankets, on top of it, we’re clearing out, fallen, trees and brush and debris. We flushed out the canal using rush. What or from the Potomac and but all that’s left right now is a small area that D.C. water is going to have completed by the end of may, at the end of this month, up to relax 10 and eleven of the sea canal doing soil remediation, so well ahead of schedule for America 250 events. This is what we call Trump speed"Video filesFullCompactSort byDateSummaryRelevancePopularityPer page81216Audio filesFullCompactSort byDateSummaryRelevancePopularityPer page81216Recipient e-mailMessage (optional)Preview

Source: Grabien Stories